This route is now open after 18 months of being closed for renovation. It is reported that the 2.5 mile gravel section was paved during this closure. This means the route is now 100% paved. I'll be checking it out in the spring.
https://www.blm.gov/visit/nestucca-river-recreation-area
1 riders found this road review useful.